Services

From engineering consultancy to the maintenance programme

19 services across five departments, arranged to cover a whole project without gaps between specialisms.

Design & Engineering

Every project starts as an idea translated into precise engineering drawings that balance form and durability.

This is the stage where the whole cost of the project is decided. The choices made here — structural system, span, clear height, design load values — determine steel tonnage, build time, and twenty years of running cost. Changing a line on paper is free; changing it on a fabricated member is not.

What we work to

  • Eurocode
  • Wind and snow loads
  • Seismic loads
  • Overhead crane loads
A 3D model of a steel hangar frame resting on shop drawings, beside a member schedule and a hard hat

Department services

Engineering consulting

Analysing project requirements and setting the optimal technical solution for structure, specification, and cost — before any dimension is fixed.

Custom design

Engineering designs built to the specific project: clear span, clear height, opening positions, and crane loads where they exist.

Shop drawings

Detailed drawings with numbered members, exact dimensions, and hole positions, reviewed and approved before cutting begins.

One hourspent fixing requirements saves a week of changes during fabrication
Request a project study

Fabrication & Construction

Quality starts in the shop, where steel structures are built to strict safety and precision standards.

The shop is where quality is either made or lost. Members are cut and drilled by machine in parallel with foundation work on site, and that parallelism is what makes steel construction faster than the alternatives — provided the shop drawings are approved before cutting starts.

What we work to

  • Mill certificates
  • Weld inspection
  • Trial assembly
  • Dimensional survey
Fabrication shop cutting a steel beam on the line, with an overhead crane and stacked sections

Department services

Steel fabrication

Forming hangar components from weather-resistant steel grades, to the Eurocode.

Site erection

Construction and erection carried out in a defined sequence that keeps the structure stable at every stage of the raise.

QA and technical supervision

Inspecting fabrication and erection against specification, with a weld inspection plan and mill certificates.

Shipping ordermatched to erection sequence — otherwise site chaos and damaged coatings
Request a project study

Installation & Maintenance

We stay with the client through every stage, from execution to long-term durability.

A steel structure lasts a long time on one condition: simple, regular maintenance. The cost curve here is sharply asymmetric — treating surface rust over a square metre is negligible, while treating a member that has lost part of its section means structural strengthening or full replacement, and downtime.

What we work to

  • Fall-arrest systems
  • Calibrated torque wrenches
  • Water-tightness test
  • As-built project file
A completed steel hangar outside, its wide opening revealing a mezzanine and steel stair

Department services

Professional installation

Installation by a specialist crew for accurate fixing and structural integrity, with bolt torque controlled and documented.

Periodic maintenance and repair

Complete maintenance plans: coating inspection, gutter clearing before the rainy season, bolt-tightness review, and sealant checks.

One annual checkof coating and gutters prevents most of the next twenty years of faults
Request a project study

Turnkey Solutions

Every project has its own requirements, and we design the solution that fits it precisely.

Some projects cannot absorb responsibility being split across a designer, a fabricator, and a contractor. For those we take the full scope — from planning to final handover — so that a single party stays accountable for dimensions, dates, and cost together.

What we work to

  • Single-party accountability
  • Binding schedule
  • Written specification
  • Turnkey handover
The turnkey cycle: a drawing, prepared sections, a bare frame and a finished hangar in one loop

Department services

Custom-spec hangars

Design and execution to the requirements of the area, the use, and the environment — including saline and industrial settings.

Materials and equipment

Raw materials and tooling at the right quality and price, under a written specification rather than a general description.

Project management to handover

From planning to final handover for turnkey projects, with a schedule and explicit acceptance items.

One partyaccountable for dimensions, dates and cost — no contractor finger-pointing
Request a project study

Quality Control & Approval

Precise inspection and testing of every member and connection to confirm conformity with the adopted building code.

Engineering safety leaves no room for guesswork or verbal estimates. At this stage we apply strict inspection protocols covering weld testing, insulation thickness, steel coating quality, and dimensional accuracy before lifting and before leaving the site. We confirm that every element conforms to the standard specification, so the structure stays safe and dependable for the long term, with no surprises in the field.

What we work to

  • Standard codes
  • Quality control
  • Defined deliverables
  • Direct responsibility
Quality control and approval — a temporary placeholder awaiting a real image

Department services

Weld and connection inspection

Testing structural connections to confirm weld integrity and conformity with the specification before a member is approved and lifted.

Coating and insulation conformity

Measuring insulation thickness and steel coating quality against the specification adopted for the project.

Dimensional check before lifting

Reviewing member dimensions and hole positions before lifting and before leaving the site, so an error is not found after erection.

Four testson every member before approval: welds, insulation, coating, and dimensional accuracy
Request a project study

Additional services

Solutions that complete the facility

The structure alone does not put a building into service. These items are usually commissioned after handover through a separate contractor; delivering them inside the same project is cheaper, faster, and less prone to conflict.

Civil works

Office buildings, guard rooms, perimeter fencing, site levelling and paving.

Insulation systems

Waterproofing, thermal and acoustic insulation to specification, with thermal bridges addressed.

Security systems

Alarms, surveillance and cameras, access control, and fire-fighting equipment.

Infrastructure

Telecom, internet and protection networks, phone exchanges, and attendance monitoring.

Energy solutions

Electrical power through solar systems and generators.

Materials and specifications

What actually goes into the structure

Grade, thickness and certification — not "high-quality steel". These are the line items on which two quotations that look alike on paper are actually compared.

Structural steel

Grade ST 37–52, in thicknesses from 1.5 to 12 mm.

Certified to ISO 9001 and the European CE mark

Aluminium

Type 3003, in thicknesses from 0.5 to 3 mm.

Certified to ASTM B209

Thermal and acoustic insulation

Composite sandwich panels from 50 to 100 mm, at 40% foam density.

Start by fixing the requirements

Use, clear dimensions, equipment movement, openings, and site conditions. Send them and we will come back with a preliminary study.

Contact us
Chat with us